Apartment renovation in Dubai, start to finish — kitchens and villas too

Renovation & fit-out · Dubai

Apartment renovation in Dubai, start to finish — kitchens and villas too

Design, approvals, construction, joinery and furnishing under one contract, with one project manager and an estimate agreed with you before demolition starts.

  • Russian- and English-speaking team
  • Price agreed in the contract
  • 2-year workmanship warranty
  • NOC and permit package prepared for you
  • Daily photo report from site

Free site visit anywhere in Dubai · estimate within 2 working days

  • 9years working in Dubai
  • 240+objects handed over
  • 45days · average apartment
  • 2 yrsworkmanship warranty
Not sure where to start? Configure your renovation in about a minute — we price it and send the figure on WhatsApp

What we do

Three things, done properly

We do not take on everything at once. Apartments, kitchens and villas — three streams, each with its own crew, its own supervisor and its own estimate template.

Apartment renovation Apartments

Apartment renovation

From a cosmetic refresh before tenants move in to a full strip-out with new layout, wiring, plumbing and joinery.

  • Cosmetic, full and premium packages
  • Layout changes with developer NOC
  • Electrics, AC, plumbing, smart home
  • Furniture and styling on handover
Price on request — configure it in 60 seconds Configure & get a price
Kitchen renovation Kitchens

Kitchen renovation

Measured, designed and installed by us; cabinetry made to our drawings by vetted UAE workshops. Stone, appliances, lighting and the wet works behind the cabinets included.

  • 3D layout and material selection
  • Cabinetry from vetted UAE workshops
  • Stone worktops and splashbacks
  • Appliance supply and integration
Price on request — configure it in 60 seconds Configure & get a price
Villa renovation Villas

Villa renovation

Full villa programmes: structural changes, facade, landscaping and pool, run to a stage-by-stage schedule agreed in the contract.

  • Structural and facade works
  • Dubai Municipality permits
  • Landscaping, pool, outdoor kitchen
  • Dedicated site manager on the project
Price on request — configure it in 60 seconds Configure & get a price

Why clients stay

The things that actually go wrong on a Dubai renovation — and what we do about them

  • The price does not drift

    The estimate is an annex to the contract. Anything extra needs your written approval before it is ordered, so you always know what is being bought and why.

  • Approvals without the paperwork headache

    Developer NOC, Dubai Municipality permits, contractor passes, working-hours rules for your building. We prepare the complete document package; you submit it in minutes, and we track every answer.

  • Everything in your language

    The estimate, the contract, the drawings and the daily site chat are in Russian or English — whichever you prefer. Your foreman speaks it too.

  • You see the site every day

    A photo and video report goes into your WhatsApp group at the end of each working day, whether you are in Dubai, Moscow or Almaty.

  • A schedule you can see

    The schedule is in the contract with stage-by-stage dates, and the weekly report shows where we are against it. If a date moves, you hear it from us in writing.

  • Two years of warranty, in writing

    Two years on our workmanship, written into the contract. Materials, appliances and hardware carry their manufacturers' warranties, and we help you claim them.

A real estimate, not a price "from"
2 yearswritten warranty on our workmanship

Estimate

A real estimate, not a price "from"

Most renovation disputes in Dubai are not about quality — they are about an estimate that grew by forty per cent halfway through. We price the job after we have seen the property, opened up what needs opening up and agreed every material with you.

  • Line-by-line estimate: every material, quantity and unit price visible
  • Material allowances agreed and signed before we start buying
  • A contingency line you control, not one we spend quietly
  • Payments tied to completed stages, never to calendar dates
How we work

How it goes

Four steps from first call to keys

  1. Site visit & estimate

    We come to the property, measure it, photograph what matters and hand you a line-by-line estimate within two working days. Free, anywhere in Dubai.

  2. Design & contract

    Drawings, 3D visuals and material selection. When you sign them off, the estimate is agreed as the contract price and attached as an annex.

  3. Approvals & mobilisation

    We prepare the NOC package for your developer and, where needed, the Dubai Municipality permit file; you submit them. Then passes, site protection, and the crew moves in.

  4. Build & handover

    Daily reports, weekly walk-throughs, snagging list closed before handover. You get the keys, the warranty and the as-built documents.

Questions

What clients ask before they sign

Can you run the renovation while I am not in the UAE?
Yes — roughly half of our clients are abroad for most of the project. You get a daily photo and video report, a weekly video walk-through, and you approve materials from photographs and samples we courier to you. Where a physical signature is needed, a power of attorney to a person you trust solves it.
Do you handle the NOC and the building's paperwork?
We prepare all of it: drawings, method statement, contractor licence and insurance copies, worker lists — everything the developer or owners association asks for, and the Dubai Municipality file where a permit is needed. The application itself goes in under your name as the owner, which takes you a few minutes; we track it and answer the building's questions. Preparing the package is included in the price.
How is payment structured?
Payments are tied to completed stages, not to dates: mobilisation, then demolition and first fix, then second fix, then finishes, with the final payment after snagging is closed and you have accepted the property. Nothing is paid for work that has not been done.
What happens if the schedule slips?
The schedule is in the contract with dates per stage, and you see progress against it every week. A late approval, a change of mind on materials or something found inside the walls moves the date, and we tell you in writing on the day it happens.
Can I use my own designer or my own materials?
Yes to both. We build to other studios' drawings regularly, and if you buy materials yourself we simply take them out of the estimate and keep the warranty on the installation. We will tell you honestly if something you have chosen will not survive Dubai humidity.
What exactly does the two-year warranty cover?
Our workmanship: tiling, plastering, painting, joinery installation, plumbing, electrical and AC works we carried out. Materials, appliances and hardware are covered by their manufacturers' warranties, not by us — we help you claim them. Normal wear and damage caused after handover are not covered.

Where we work

All of Dubai, and the communities we know best

We have run projects in these communities and know their rules, their management companies and how long their approvals take.

  • Palm Jumeirah
  • Dubai Marina
  • Downtown Dubai
  • Business Bay
  • Jumeirah Beach Residence
  • Jumeirah Lake Towers
  • Jumeirah Village Circle
  • Dubai Hills Estate
  • Arabian Ranches
  • Emirates Hills
  • Al Barsha
  • Jumeirah
  • Damac Hills
  • The Springs
  • The Meadows
  • Dubai Creek Harbour
  • Bluewaters
  • City Walk
  • Tilal Al Ghaf
  • Mudon
  • Town Square
  • Dubai Silicon Oasis
  • Al Furjan
  • Mirdif

Start here

Let us look at your property

A site visit and a line-by-line estimate cost you nothing and take two working days. After that you will know exactly what your renovation costs — with us or with anyone else.

Free site visit

Get a line-by-line estimate

Tell us about the property — we will come to the site, measure it and come back with a line-by-line estimate within two working days. No charge, no obligation.

By sending this form you agree to our privacy policy. We reply during working hours, usually within an hour.