Renovation & fit-out · Dubai
Apartment renovation in Dubai, start to finish — kitchens and villas too
Design, approvals, construction, joinery and furnishing under one contract, with one project manager and an estimate agreed with you before demolition starts.
- Russian- and English-speaking team
- Price agreed in the contract
- 2-year workmanship warranty
- NOC and permit package prepared for you
- Daily photo report from site
Free site visit anywhere in Dubai · estimate within 2 working days
- 9years working in Dubai
- 240+objects handed over
- 45days · average apartment
- 2 yrsworkmanship warranty
Where do you fit
Four kinds of owner, four different conversations
What we do
Three things, done properly
We do not take on everything at once. Apartments, kitchens and villas — three streams, each with its own crew, its own supervisor and its own estimate template.
Apartments
Apartment renovation
From a cosmetic refresh before tenants move in to a full strip-out with new layout, wiring, plumbing and joinery.
- Cosmetic, full and premium packages
- Layout changes with developer NOC
- Electrics, AC, plumbing, smart home
- Furniture and styling on handover
Kitchens
Kitchen renovation
Measured, designed and installed by us; cabinetry made to our drawings by vetted UAE workshops. Stone, appliances, lighting and the wet works behind the cabinets included.
- 3D layout and material selection
- Cabinetry from vetted UAE workshops
- Stone worktops and splashbacks
- Appliance supply and integration
Villas
Villa renovation
Full villa programmes: structural changes, facade, landscaping and pool, run to a stage-by-stage schedule agreed in the contract.
- Structural and facade works
- Dubai Municipality permits
- Landscaping, pool, outdoor kitchen
- Dedicated site manager on the project
Why clients stay
The things that actually go wrong on a Dubai renovation — and what we do about them
The price does not drift
The estimate is an annex to the contract. Anything extra needs your written approval before it is ordered, so you always know what is being bought and why.
Approvals without the paperwork headache
Developer NOC, Dubai Municipality permits, contractor passes, working-hours rules for your building. We prepare the complete document package; you submit it in minutes, and we track every answer.
Everything in your language
The estimate, the contract, the drawings and the daily site chat are in Russian or English — whichever you prefer. Your foreman speaks it too.
You see the site every day
A photo and video report goes into your WhatsApp group at the end of each working day, whether you are in Dubai, Moscow or Almaty.
A schedule you can see
The schedule is in the contract with stage-by-stage dates, and the weekly report shows where we are against it. If a date moves, you hear it from us in writing.
Two years of warranty, in writing
Two years on our workmanship, written into the contract. Materials, appliances and hardware carry their manufacturers' warranties, and we help you claim them.
Estimate
A real estimate, not a price "from"
Most renovation disputes in Dubai are not about quality — they are about an estimate that grew by forty per cent halfway through. We price the job after we have seen the property, opened up what needs opening up and agreed every material with you.
- Line-by-line estimate: every material, quantity and unit price visible
- Material allowances agreed and signed before we start buying
- A contingency line you control, not one we spend quietly
- Payments tied to completed stages, never to calendar dates
How it goes
Four steps from first call to keys
Site visit & estimate
We come to the property, measure it, photograph what matters and hand you a line-by-line estimate within two working days. Free, anywhere in Dubai.
Design & contract
Drawings, 3D visuals and material selection. When you sign them off, the estimate is agreed as the contract price and attached as an annex.
Approvals & mobilisation
We prepare the NOC package for your developer and, where needed, the Dubai Municipality permit file; you submit them. Then passes, site protection, and the crew moves in.
Build & handover
Daily reports, weekly walk-throughs, snagging list closed before handover. You get the keys, the warranty and the as-built documents.
Recent work
Projects photographed on site
Real objects, our own photos and video, from strip-out to handover.
Questions
What clients ask before they sign
Can you run the renovation while I am not in the UAE?
Do you handle the NOC and the building's paperwork?
How is payment structured?
What happens if the schedule slips?
Can I use my own designer or my own materials?
What exactly does the two-year warranty cover?
Where we work
All of Dubai, and the communities we know best
We have run projects in these communities and know their rules, their management companies and how long their approvals take.
- Palm Jumeirah
- Dubai Marina
- Downtown Dubai
- Business Bay
- Jumeirah Beach Residence
- Jumeirah Lake Towers
- Jumeirah Village Circle
- Dubai Hills Estate
- Arabian Ranches
- Emirates Hills
- Al Barsha
- Jumeirah
- Damac Hills
- The Springs
- The Meadows
- Dubai Creek Harbour
- Bluewaters
- City Walk
- Tilal Al Ghaf
- Mudon
- Town Square
- Dubai Silicon Oasis
- Al Furjan
- Mirdif

Start here
Let us look at your property
A site visit and a line-by-line estimate cost you nothing and take two working days. After that you will know exactly what your renovation costs — with us or with anyone else.
Free site visit
Get a line-by-line estimate
Tell us about the property — we will come to the site, measure it and come back with a line-by-line estimate within two working days. No charge, no obligation.
- Phone & WhatsApp+971 55 865 2433
- Emailinfo@remontbureau.ae
- OfficeAl Quoz Industrial Area 3, 22nd Street
Dubai, United Arab Emirates - Working hoursMon–Sat 09:00–19:00 (GST)